The first ten days: emergency response and protection strategies for the preservation of historic structures
MILFORD WAYNE DONALDSON, FAIA
Architect, Milford Wayne Donaldson and Associates


The majority of all decisions for the disposition of earthquake-damaged
historic structures are made within the first ten days of a declared national
emergency. The devastating effects of the 17 January 1994 Northridge
earthquake on historic buildings showed once again that strategies for the
preservation of these unique resources are at the mercy of local, state and
federal agencies. Alternative preservation strategies are needed to complement the post-disaster public safety recovery and reconstruction methods already in place during the disaster period. The declared emergency may last from 30 to 90 days.
Following the declaration of emergency by the President of the United States
upon request by the Governor of the State, there is a myriad of federal, state
and local laws, codes, ordinances and policies that are implemented within two to three days that set the stage for decision-making. Although local agencies begin search and rescue methods to protect life, the greatest threat to historic structures are policies set by the Federal Emergency Management Agency (FEMA) and the State Office of Emergency Services.
The ATC-20 red "unsafe" placards, the suspension of protection under the
California Environmental Quality Act, conservative attitudes of
liability conscious assessment volunteers unfamiliar with historical or older
building construction, the rush to secure the "limited" FEMA funds for
demolition and the unfortunate interpretation of "imminent threat" to bodily
harm or damage to adjacent property continue to destroy historic buildings. In the case of historical structures, where damage following a moderate seismic event will always be present, the attitude is that a damaged building is dangerous and should be demolished. Many damaged historical buildings are torn down to be replaced with a "replica". Unfortunately, the concept of
replication is becoming popular, even amongst the preservation community.
For federally funded projects, the "Section 106" process does not become
effective until after 30 days of the declaration of an emergency. The
administration time required by the State Historic Preservation Officer (SHPO) is overwhelming and the staff cannot service the number of requests. In the case of the Northridge Earthquake, SHPO contracted with a private firm to oversee and review over 2,000 applications under Section 5028 of the State of California Public Resources Code. However, the determination of "imminent threat" continues to be made at the local level and usually within five to seven days the decision to remove the threat has been finalised.
Throughout the last 12 years, there has been a great deal of effort and
understanding for the preservation of historic buildings of the various local,
state and federal agencies. However, the greatest protection comes from
education and preparedness of the local decision makers. Since there are few historic structures noted on local, state or national registers within
California, it may be possible to predetermine the disaster response methodology far in advance of the event. At the very least, the local city or county disaster ordinance should identify the procedures of dealing with historic buildings and be prepared with an updated list of the historic structures within the region.
The emergency response and protection strategies that should be implemented within the first ten days following a seismic event for the preservation of historic buildings are the following:
- A knowledgeable team consisting of a preservationist, structural engineer
and preservation architect familiar with older construction methods should be
"on-line" and aware of the locations of the historic resources on a regional
basis. The structural engineer and architect should be registered as a
Disaster Service Worker with the Office of Emergency Services. This team
should be in addition to the County's Department of General Services Historic
Resources Team.
- Permission should be obtained to assess the damage to the historic structure from the local agency in charge of disaster recovery and the assessment team should be allowed to report directly to the owner the recommendations for restoration or stabilisation and provide cost estimates.
- Informational brochures should be available for local disaster personnel
describing policies, laws and ordinances applicable to historical buildings.
Recommended information should be as least the following:
- National Preservation Act, Section 106 process.
- Programmatic Agreements (if available) between FEMA, Office of Emergency Services, SHPO and the National Advisory Council for Historic Preservation.
- Joint FEMA/Office of Emergency Services Section 406 (Stafford Act) Hazard Mitigation Policy
Statement.
- State Historical Building Code and the State Historical Building Safety
Board's jurisdiction and appeal process.
- Section 5028 of the California Public Resources Code and related California Environmental Quality Act issues.
- California Seismic Safety Commission's Seismic Retrofit Incentives
for Local Government.
- The Local Disaster Response Ordinance with emphasis on historic
buildings.
- The Secretary of the Interior's Standards and Guidelines for the
Rehabilitation of Historic Buildings.
- All decisions regarding demolition, partial demolition or repair methods
resulting in a significant loss of historic fabric to the historical resource
should receive a qualified second opinion.
- Promote the shoring and stabilisation of "imminent hazards" by initiating a
working collaboration with the Urban Search and Rescue Team through the US Army Corp of Engineers and Office of Emergency Services. FEMA provides reimbursement of engineering fees and material costs for temporary measures. Attempt to salvage all historic fabric and store in the resource, including loose or fallen pieces.
- Promote the transfer of sale to an interested party if an owner does not
want to restore his/her historic building. Unfortunately, the State Building
Seismic Program recommends replacement of an historical building when the
retrofitted cost exceeds the Benefit Cost Ratio of 120% of the new cost.
Although this percentage is much better than the 60% normal building profile,
many of the retrofit cost estimates are not made by knowledgeable persons with extensive experience in retrofitting historic buildings. For state-owned
historic buildings, the Division of the State Architect and the SHPO must be involved in the review process.
- A separate and distinct damage assessment placard for historic resources
should be provided. Recommendations should always include permanent
protection from increment weather and potential aftershocks. With
publicly-owned historic buildings, the process to initiate repair may take as
long as 12 to 16 months.
- During the discussion of the retrofit methodology the engineer should note that the program is to reduce hazard to life. Damage during a moderate seismic event should be expected at definite locations within most historic and older structures.
- Establish a detailed response repair ordinance for the historic buildings
within the region, including permanent seismic strengthening methods to
mitigate "imminent threats" to life safety and damage to adjacent properties.
- Provide guidance for the sensitive mitigation of hazardous materials during the disaster assessment. The removal of asbestos-containing materials, lead-based paints, pigeon dung, bat quano and other health hazards have resulted in the removal of the historic fabric during the "clean-up" phase.
In summary, during the "crisis management" phase following a seismic event, the preservation of historic resources becomes the lowest priority of disaster-related activities for local, state and federal agencies. The programmatic
responses and mandated processes are intact and generally not subject to
change. The best way to implement preservation programs is to become part of the process and quickly provide educational information and qualified
assessment personnel within the first ten days following the disaster.
Bibliography
- Advisory Council on Historic Preservation (1986)
- 36 CFR Part 800: Protection of Historic Properties.
- California Preservation Foundation (1990)
- Living on the Fault Line. Workshops, Feb.- Mar.
- California Preservation Foundation (1993)
- The Writ is Mightier than the Wrecking Ball. Workshop, March.
- California Preservation Foundation (1990)
- Newsletter. January.
- California Preservation Foundation (1994)
- Newsletter. February.
- Department of General Services (1994)
- State Building Seismic Program Recommendations. Division of the State Architect, State of California, April.
- Federal/State/Local Coordinating Office (1994)
- Joint FEMA/OES Section 406 (Stafford Act) Hazard Mitigation Policy Statement. Pasadena, CA. September 16.
- FEMA, OES, SHPO, NACHP (1994)
- Northridge Programmatic Agreements. February 7.
- Governor's Office of Planning and Research (1994)
- CEQA and Historical Resources. State of California. April.
- Harthorn, Roy (1994)
- The Post-Earthquake Safety Evaluation and Damage Repair Assessment of Historic Buildings. Graduate Project, California State University, Northridge, CA. December.
- Merritt, John (1990)
- History at Risk. Loma Prieta: Seismic Safety and Historic Buildings. California Preservation Foundation.
- Office of Historic Preservation (1989-92)
- Public Resources Code Section 5020-5028 et seq.
- State Historical Building Safety Board (1990)
- State Historical Building Code. H & SC Section 18950 et seq. Title 24, CCR, Part 8.
[Top of page]
[Return to Table of Contents]


Document version:1.0.6
Document created: August 9, 1995
Document last updated: October 23, 1997
Maintained by: © Dirk H. R. Spennemann , e-mail,